RM新时代手机版下载-首页

<dfn id="1oi66"><mark id="1oi66"><div id="1oi66"></div></mark></dfn>

    <nav id="1oi66"></nav>
    <menuitem id="1oi66"><option id="1oi66"></option></menuitem>

  1. <nav id="1oi66"></nav><del id="1oi66"><center id="1oi66"></center></del>
    服務(wù)熱線(xiàn):
    13512115259
    您的位置: 首頁(yè)>公司資訊>MG ROVER GROUP

    MG ROVER GROUP

    發(fā)布日期:2013-11-25   瀏覽量:989

    MG ROVER GROUP

    MG ROVER GROUP
    ENGINEERING STANDARDS
    Issue No: 2 MGR ES:
    TITLE: Generic Electrical/Electronic Component Test Date: 25th March 2005
    - 32 -
    - Printed Copy is Uncontrolled - Check Issue is Current -
    Specific requirements:
    Applicable components See Table 2
    Mounting position In vehicle-mounted attitude with associated brackets and components
    Test duration 30 cycles
    Electrical operation: Permanent battery feed only
    Water temperature 80°C
    Water pressure 100 o 3 Bar
    Water discharge angle 35° o 5p
    Distance of jet nozzle 80 to 100mm
    from test sample
    Spray time 10s for each accessible spatial direction (when installed in the vehicle),
    followed by a 10s break
    Assessment: The test sample must be fully capable of functioning

    在線(xiàn)咨詢(xún) 聯(lián)系方式 二維碼

    服務(wù)熱線(xiàn)

    86-21-57600775

    掃一掃,關(guān)注我們

    RM新时代手机版下载-首页

    <dfn id="1oi66"><mark id="1oi66"><div id="1oi66"></div></mark></dfn>

      <nav id="1oi66"></nav>
      <menuitem id="1oi66"><option id="1oi66"></option></menuitem>

    1. <nav id="1oi66"></nav><del id="1oi66"><center id="1oi66"></center></del>

      <dfn id="1oi66"><mark id="1oi66"><div id="1oi66"></div></mark></dfn>

        <nav id="1oi66"></nav>
        <menuitem id="1oi66"><option id="1oi66"></option></menuitem>

      1. <nav id="1oi66"></nav><del id="1oi66"><center id="1oi66"></center></del>
        RM新时代专业团队 RM新时代正规平台入口-百度知道 RM新时代登录网址 rm新时代跑路 RM新时代平台网址